Installation Instructions – T-Bar
Aircraft Cables Sit in .368'' from the End of the Fixture
Mounting Points Equal Fixture
Lengths 4', 8' or 12'
Power Feed
Figurt 8.
Mounts Locations
** Tegular Ceiling Interface (Connection at Ceiling)
Aircraft Cable Mounting AC-_-T1
Mount Dttails
Flex Conduit &
Connector (By Others)
4" Square Outlet
Box 1 1/2" Deep
(By Others)
NPT Lock Nut
Tied Off to Structure
(By Others)
1/2" NPT Fitting
T-Bar Clip
1/4" Washer
Used Only in
Tegular* Ceiling
Tile Application
Aircraft Cable Coupler
Aircraft Cable
N
otte:
T-Bar Clip Must be Tied Off to Structure
Figurt 9.
Power
Fixturt Installation Stqutnct
1.
Layout mounting locations. (Figure 9.)
2.
Ensure that power feed is at the UL end of the fixture.
N
otte:
Power feed: to be installed to local/national
electrical codes by a Certified Electrician.
3.
Install T-bar clip to T-bar and tie back to structure.
4.
Place canopy and caddy clip stud and attach aircraft
cable.
4
First Section
Plenum Rated Tie
Strap (By Others)
Cover Plate
(By Others)
1/4-20 Bolt
J-Box Clip
T-Bar
1/4"-20 Stud
1/4"-20 Nut Used Only
in Deep Tegular* Ceiling
Tile Application
5" Canopy
Snap Bushing
Power Cord
Installation Instructions – T-Bar
ADE141262
Mounting Points Equal Fixture
Lengths 4', 8' or 12'
***Consecutive Section
***For Continuous Rows See Joining Sheet
N
otte:
For Tegular Ceiling Tile applications use (2) 1/4"
washers (supplied) for spacing between the canopy
and the ceiling tile.
For Deep Tegular Ceiling Tile applications use 1/4"-20
N
otte:
nut (supplied) for spacing between the canopy and
the ceiling.
5.
At the end of the 4x4 square outlet box break KO in
corner and secure 1/2" NPT fitting to box.
6.
Clip J-Box Clip to T-Bar.
7 .
Secure J-Box to J-Box Clip using 1/4"-20 bolt.
8.
Secure snap bushing to canopy and align up to NPT
fitting.
9.
Install solid or flexible conduit from power source to
1/2" cable fitting and secure to tie wire using Plenum
Rated Tie Strap.
10. Feed power cord through canopy and J-Box, then install
metal strain relief.
11. Attach wires ensuring all connections are properly
matched.
12. Cover J-Box using appropriate cover plate.
** All tegular installs must consult factory. Depth of tegular
tile will dictate length of 1/4"-20 stud and a 1/4-20" nut may
be required. Depth of tegular tile is required upon sign-off.
Tegular Depth: ________________________
Figurt 10.
Power Tegular**