KOBE CH00 Série Manuel D'installation Et Mode D'emploi page 16

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD,
PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
Decide the location of the venting pipe from the hood
to the outside. (Figure 16)
A straight, short venting run will allow the hood to
perform more efficiently.
Try to avoid as many transitions, elbows, and long
run as possible. This may reduce the performance
of the hood.
Temporarily wire the hood to test for proper
operation before installing
Important: Peel protective film off the hood and
the duct cover (if any).
If necessary, prepare back wall frame with cross
framing lumber for secure installation.
Table 2 and measurements on Page 25 to decide
the level of the lumber. (Figure 17)
Loosen hood-mounting brackets at the back of the
hood, adjust brackets and tighten screws.
If necessary, remove the rubber stand on the back
of the hood. (Figure 18)
RA02 SERIES – INSTALLATION
Refer to
14
Figure 16
Figure 17
Figure 18

Publicité

Table des Matières
loading

Table des Matières