Hatco IRNG Serie Manuel D'installation Et D'utilisation page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
Flush Mount Installation
Flush mount installation requires a prepared, solid material
countertop and provides a seamless transition between the
countertop and the induction range. A special, "stepped" cutout
is required for flush mount installation.
1. Carefully measure and cut the step-style opening in the
countertop. The thickness of the solid material countertop
material should be a minimum of 22 mm (13/16").
a. Refer to the Flush Mount Countertop Cutouts illustration
below for the dimensions of each cutout.
• Two cutouts are required;
a partial depth outer
cutout, and an inner
cutout—the
material
between the cutouts is
removed. This creates a
step for the flange of the
Induction Range to sit
on below the level of the
countertop.
b. Create the outer, partial depth cutout.
• Depth = 11.5 mm (7/16") for models IRNG-PB1-30/-36
c. Create the inner cutout. Then, remove the material in
between the cutouts to create the step.
371 mm
(14-5/8")
Outer Cutout
Inner Cutout
Flush Mount Countertop Cutouts
2. Cut and drill the appropriate holes in the vertical surface
where the control enclosure will be installed. Refer to
the "Installing the Control Panel" procedure for cutout
dimensions.
3. Cut the required openings in the cabinetry to provide proper
ventilation to the induction range. Refer to the "Ventilation
Requirements" listed previously in this section.
4. If necessary, make structural modifications or add bracing
underneath the countertop to ensure the countertop will
support the weight of the unit and its contents.
NOTE: The countertop must be level to ensure proper operation
of the Induction Range.
Step
Outer Cutout
11.5 mm
Countertop
Inner Cutout
327 mm
(12-7/8")
353 mm
(13-7/8")
346 mm
(13-5/8")
5. Carefully lower the unit into the opening, making sure the
power cord and control cable do not get pinched.
Silicone
Countertop
Standard Flush Mount Installation
6. Apply a bead of National Sanitation Foundation (NSF)-
approved silicone sealant in the gap between the
countertop and the induction range. To apply a clean,
consistent sealant bead:
a. Make sure the unit is centered in the countertop cutout.
b. Install masking tape on each side of the gap to define the
edge of the sealant.
c. Carefully apply sealant into the gap.
d. Quickly smooth the sealant surface.
e. Carefully remove the masking tape before the sealant
dries.
NOTE: The silicone sealant must be rated for use at
temperatures up to 121°C (250°F)
7. Install the control panel in the desired location. Refer to the
"Installing the Control Panel" procedure.
8. Plug the unit into a properly grounded electrical receptacle
of the correct voltage, size, and plug configuration. See the
SPECIFICATIONS section for details.
• A Welcome Screen will appear on the Control Display for
a few seconds, then the display will go blank.
Trim Ring Installation
Trim ring installation requires the purchase of the accessory trim
ring and can be performed in a solid material or stainless steel
countertop. Use the following procedure for trim ring installation.
TRIM-PB1-36 = Models IRNG-PB1-30/-36
1. Carefully measure and cut the opening in the countertop.
356 mm
Trim Ring Installation Countertop Cutout
8
Front of Unit
(14")
381 mm
(15")
Form No. IRNGCEM1-0118

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Irng-pc1-30Irng-pc1-36Irng-pb1-30Irng-pb1-36

Table des Matières