Westline WGE 4 WH Notice D'utilisation page 47

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. INSTALLATION AND PREPARATIONS FOR USE
Spanner
Injector
Adjusting the reduced flame position
The flame length in the minimum position is adjusted with a flat screw located on the valve. For
easier reduced flame adjustment, it is advised to remove the control panel and microswitch during
adjustment.
To determine the minimum position, ignite the burners and leave them at minimum position. With
the help of a small screwdriver fasten or loosen the bypass screw around 90 angular degrees. When
the flame has a length of at least 4mm, the gas is well distributed. Make sure that the flame does
not die out when passing from the maximum position to the minimum position. Create an artificial
wind with your hand toward the flame is stable.
Changing the gas inlet:
For some countries, the gas inlet type can be different for NG/LPG gases. In such a case, remove the
current connection components and nuts (if any) and connect the new gas supply accordingly. In all
conditions, all components used in gas connections should be approved by local and/or
international authorities.
Regularly check the expiry date of your gas pipe. When the expiry date is reached, it is necessary to
change the hose. These pipes are available on the market and must be consistent with current
standards. After changing the hose, you should check that there is no leakage by referring to the
information in the above paragraph: Connecting gas and checking leakage.
Figure 9
:
Figure 10
Figure 12
13
Figure 11

Publicité

Table des Matières
loading

Table des Matières