Westline WGE 4 WH Notice D'utilisation page 43

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. INSTALLATION AND PREPARATIONS FOR USE
Installing your hob
The Hob is supplied with a special seal in order to avoid any liquid ingress in the work top. Cut out an
opening in the top of your kitchen unit that corresponds to the measurements given in figure. Apply
the self adhesive seal to all edges of the section and carefully fit the hob into the opening in such a way
that the knobs will be on the right side.
The thickness of the top of your kitchen unit must be between the dimensions given in the figure. For
the thickness less than 25 mm the thick wooden spacers can be inserted between the bracket and
undersurface. If the thickness is greater than 25 mm slots can be cut in the under surface of the
furniture to house the bracket.
Min.
25mm
The leaf springs located on the lower left and right sides of the hob will fix the hob in the opening.
Create a space to install your hob, following the dimensions indicated on figure.
• 100 mm from edge of cooker to combustible materials.
• 700 mm underside of overhead cupboards, shelving
• 750mm underside of overhead extractor fans.
This appliance must be installed according to the manufacturers installation instructions, local building
regulations, gas authority codes and electrical wiring instructions.
Min.
B
42 mm
Min.
A
Wall
Combustible
Non-combustible
9
A[mm]
B[mm]
60
150
40
50
Figure 6

Publicité

Table des Matières
loading

Table des Matières