Fisher & Paykel DCS BFGC-30 Guide D'installation / Guide D'utilisation page 16

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
CART ASSEMBLY INSTRUCTIONS
3. Position tabs on side bracket to fit into slots on the cart (be aware of pinch points)(Fig. 12-13). When complete,
the leading ledge should sit flush on the top of the cart (no gap)(Fig. 14).
Fig. 12
4. Secure the head to rear of cart (Fig. 15) with (2) Phillips-head screws provided (10-24 x 1/2").
5. Install remaining (3) screws (10-24 x 1/2") into the front of head to the cart (Fig. 16).
6. Slide drip tray/pan back into place and reinstall parts removed in Step 3, #1.
Fig. 15
PINCH POINT
Fig. 13
14
Fig. 16
Fig. 14

Publicité

Chapitres

Table des Matières
loading

Table des Matières