Fisher & Paykel DCS BFGC-30 Guide D'installation / Guide D'utilisation page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
CART ASSEMBLY INSTRUCTIONS
Step 1
Link Carts Together (optional)
(To link two or more CAD carts, the following instructions must be done first, using
the hardware provided, before installing the top modules.)
1. To link your carts together - hand tighten 2 bolts, 4 washers, and 2 nuts on the front and back sides of the carts as
shown in Fig. 04. Carefully wrench tighten fasteners once carts are aligned with each other.
CAUTION:
Once the carts are linked, they cannot be moved. Moving the carts once linked could damage the carts.
End of bolt with nut and washer
Head of bolt with washer
Fig. 05
Head of bolt with washer
12
End of bolt with nut and washer

Publicité

Chapitres

Table des Matières
loading

Table des Matières