Installation Precautions

Follow all safety precautions listed below for inverter installation and connection.
● Do not connect to systems other than our storage grid-tied system.
● Do not install in locations where the commercial power grid exceeds 100 A.
● Do not install in salty regions within 1000 meters (3280 ft.) of the coast line.
● Do not install in locations where vents may be blocked by the accumulation of snow.
(For areas with significant snowfall, install the inverter under a roof or in an enclosure.)
● Do not install in locations where ambient temperature is below -20°C (-4°F) or above 40°C (104°F).
● Do not install in areas with high humidity or in direct sunlight.
● Only install in locations with sufficient space and ventilation. (See "Installation Site" on page 10.)
● Do not expose the inverter to excessive steam, oily mist, smoke, dust, salt, corrosive materials,
explosive/flammable gases, chemical agents, or fire.
● Do not install at elevations above 1000 meters (3280 ft.).
● Do not install in locations where temperature fluctuates drastically and condensation occurs.
● Do not install in locations with stringent noise regulations (less than 45 dB).
● Do not install in locations that are subject to large vibrations or impacts.
● Do not install in locations where a concrete foundation (anchor bolt installation) cannot be built.
● Do not install in locations where wiring holes cannot be drilled into exterior walls.

Acceptance Flow

Coordination with the Power Company
Customer Consultation/Explanation
Start of Grid-tied Operation
Page 10
Page 11
Install the inverter and remote control panel.
Page 15
Page 24
Page 28
Set parameters such as line excessive voltage.
Page 29
Page 31