Fisher & Paykel DCS 30 BGC Instructions D'installation Et Guide D'utilisation page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
LOCATING GRILL/BUILT-IN CLEARANCES (ALL MODELS)
Clearances to Combustible Construction**
30"(76,2cm)
18"
(45,7cm)
min.
** DEFINITION OF COMBUSTIBLE MATERIAL - Any materials of a building structure or decorative structure made of
wood, compressed paper, plant fibers, vinyl/plastic or other materials that are capable of transferring heat or be-
ing ignited and burned. Such material shall be considered combustible even though flame-proofed, fire-retardant
treated or surface-painted, or plastered.
Important!
It is required that a minimum of (3)10 sq. inches / 64,5cm
and right sides, as well as the back of enclosure (Fig. 04), in order to safely dissipate unburned gas vapors in
the event of a gas supply leak.
WARNING!
Note specific built-in enclosure ventilation requirements. See text and Fig. 04.
GENERAL
The grill is designed for easy placement into built-in masonry enclosures. For non-combustible applications the
grill drops into the opening shown in Fig. 04 and hangs from its side flanges. A deck is not required to support it
from the bottom. When using the insulated jacket in a combustible enclosure application, see the bottom of Fig.
04. The insulation jacket assembly must be supported from the bottom by a ledge on each side and back or a
solid deck.
A carpenter's "spirit level" should be used to assure that the unit is level both front-to-back and side-to-side. If it
is not level, burner combustion may be erratic or the unit may not function efficiently for grease flow. If the floor
is uneven or has a decided slope, re-leveling may be required after each moving of a freestanding unit.
INSULATED JACKET:
WARNING!
Installing this product into a combustible enclosure without an insulated jacket could result in fire, property damage
and personal injury.
If the grill is to be placed into a combustible enclosure, an approved insulated jacket is necessary. Insulated jack-
ets are available from your dealer. Use only the DCS insulated jacket which has specifically been designed and
tested for this purpose. Review the detail drawing shown (Fig. 04) and take into account the provisions shown for
gas line hook-up clearance in the right rear corner. It is required that ventilation holes are provided in the enclo-
sure to eliminate the potential build-up of gas in the event of a gas leak. The supporting ledges or deck must be
level and flat and strong enough to support the grill and insulated jacket. The counter should also be level.
18"
(45,7cm)
min.
rotisserie
motor
24-1/4"
(61,6cm)
10-1/2"
(26,67cm)
2-3/16"
(5,5cm)
FIG. 03
of ventilation opening be provided for both the left
2
9
grill
exhaust
26-5/8"
(67,6cm)
Bottom of
support ange
10 "
(25,4cm)
22-5/16" (56,7cm)
25-1/2"(64,77cm)
(BH1-30R illustrated)
Maintain18"
(45,7cm) min.
from combustible
construction

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Dcs 30 bh1Dcs bh1-30rDcs bgc30-bq

Table des Matières