GreenWorks Optimow 4 Manuel Opérateur page 16

Masquer les pouces Voir aussi pour Optimow 4:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 114
Installation
EN
16
GREENWORKSTOOLS.EU
Version 1 - 2020.12.31
Insert both ends of the boundary wire as well as the end of the guide
wire into the splice and guide wire connector. Check that the wires are
fully inserted into the splice and guide wire connector so that the ends
are visible through the splice and guide wire connector.
Squeeze down the button on top of the splice and guide wire connector
fully using a polygrip until you hear a click.
Secure the splice and the boundary and guide wires either using pegs
or by burying.
Connect the guide wire to the charging station as follows:
1
Remove the protective cover on the charging station and thread
the guide wire behind the tabs into the channel leading to the
terminals.
2
Connect the guide wire to the contact pin on the charging station
that is labelled G1.
G1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Optimow 5Optimow 7

Table des Matières