Connecting The Power Cables; Turning On The System - Dell PowerEdge C5125 Guide De Mise En Route

Masquer les pouces Voir aussi pour PowerEdge C5125:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Connecting the Power Cables

1 On the back of the system, connect the mains power cable to the system's
power socket.
2 Plug the other end of the power cables into a grounded electrical outlet or
a separate power source such as an uninterrupted power supply or a power
distribution unit.
NOTE:
AC Port 1 provides power to PSU1, ACP Port 2 provides power to PSU2. See
Populate the System step 3 for further information.

Turning On the System

When connected to a power source the system automatically powers on.
See the Using the Baseboard Management Controller Guide at
support.dell.com/manuals.
12
Installation and Configuration
AC Port 2
AC Port 1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

B04s

Table des Matières