Faber LITHOS Manuel D'instructions page 8

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
INSTALLATION
Mark the following on the wall:
• a vertical line up to the ceiling or surface above the hood, at the centre of the area in which
the hood itself is to be fitted;
• a horizontal line at: 650 mm min. above the Hob;
• Rest the Bracket 7.2.1 as indicated, 1-2 mm from the ceiling or surface above the hood,
aligning its centre (grooves) with the vertical reference line.
• Mark the centres of the holes in the bracket.
• Rest the Bracket 7.2.1 as indicated, X mm under the first bracket (X = height of the Upper
chimney provided), aligning its centre (grooves) with the vertical reference line.
• Mark the centres of the holes in the bracket.
• Mark a reference point as indicated at 105 mm from the horizontal reference line.
• Drill the points marked using an ø 8 mm bit.
• Insert the plugs 11 into the holes.
• Fix the Brackets, using the screws 12a (4.2 x 44.4) provided.
• As indicated above, mark a reference point 373 mm above the horizontal reference line, and
150 mm to the right of the vertical reference line.
• Repeat this operation on the opposite side, checking to ensure it is level.
• Drill the points marked using an ø 12 mm bit.
• Insert the plugs, screws and bracket 11a into the holes, and fasten.
EN
Drilling the Wall
12a
150 150
8
8

Publicité

Table des Matières
loading

Table des Matières