Assembly Instructions - Kobalt VT6389 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PREPARATION
Estimated Installation and Assembly Time: 20 minutes
Tools Required for Installation and Assembly (not included): Safety Glasses; Work Gloves; 9/16 inch
Socket and Ratchet; Adjustable Wrench
ADDITIONAL PARTS REQUIRED FOR USE [not included]
Parts - available at local hardware store.
1. Air Hose
2. Pipe Thread Sealant

ASSEMBLY INSTRUCTIONS

1. Unbolt the unit from the shipping skid. Use a
ratchet with a 9/16 inch socket. Remove the
unit from the skid. Discard shipping hardware
once removed.
2. Install rubber feet with nuts and washers.
Hardware Used
AA
Nut
BB
Washer
CC
Rubber Foot
1
Shipping
Bracket
Shipping
Bolt
2
x2
x2
x2
8
Shipping
Bolt
AA
BB
CC
kobalttools.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

0268707

Table des Matières