Declaration Of Compliance; Installation; Installing The Appliance; Checking For Adequate Ventilation - Lotus cooker BRF-64G Instructions Pour L'installation Et L'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

The manufacturer declares that the appliances are compliant with the prescriptions of the EEC norm 90/396. The
installation must be done observing the norms in force particularly concerning room ventilation and discharging gas
emissions.
N.B. The manufacturer declines any responsibility for direct or indirect damage caused by improper or incorrect
installation, maintenance or use of the appliance, as in all the other cases considered in the items of our sales conditions.
DIMENSIONS
MODEL
BRF-64G
The operations for installing, conversions for use with other types of gas and starting up must be done only by
qualified personnel whose qualifications comply with the norms in force.
The gas installation, the electrical connections and the rooms in which the appliances are installed must comply
with the norms in force in the Country in which the installation is effects; above all, the appliance must be installed
in a well ventilated room, preferably under an extractor hood, so as to ensure the complete extraction of gas
emissions which are formed during combustion. The air necessary for combustion is 2
installed.
Make sure that the air intake into the room where the appliance is installed is sufficient for an adequate change of air, as
specified by regulations in effect.
The appliances installed in buildings open to the public must satisfy the following requirements.

Installation rules

The installation and maintenance of the appliance must be done according to the correct procedures and regulation
texts in use, particularly:
• safety standards for the prevention of fire and panic.
Connection and installation of appliance, ventilation and exhaust removal systems, shall be done according to the
Manufacturer's instructions and by qualified technicians and according to the regulations in effect. The electric wiring
shall conform to the regulations in effect. All fire prevention codes shall be observed.
a) General indications (Rules valid for GB only)
- For all appliances:
Gas safety Regulations, 1984; Health and safety at Work Act, 1974 Codes of Practice, BS 8173, 1982, The Building
Regulations 1985; The Building Standards Regulations, 1981, the IEE Regulations and the by-laws of the local Water
Undertaking.
The local gas Region or LPG supplier and the local authority and the relevant recommendation of the British Standards
(latest editions) concerned.
The installation, transformation and repair of appliances for professional kitchens as well as removal due to
malfunction,
and the supply of gas, may be made only by means of a maintenance contract stipulated with an authorised sales office
and in observance of technical regulations.
The appliance can be installed by itself or in a series side by side with appliances produced by us. There must be a
minimum distance of at least 10 cm between the appliance and the sides of the nearby cabinets made of inflammable
material. Take suitable measures to guarantee thermal insulation of the inflammable sides, such as, for example, the
installation of protection against radiation. The appliances must be installed in a suitable manner, observing the safety
standards. The small feet are adjustable to level the appliance.
The gas connection must be effected with steel or copper pipes, or otherwise with flexible steel pipes in compliance
with the national norms, if any exist. Each appliance must be provided with a cut-off cock for rapid interruption of the
gas supply. Once the appliance has been installed, it is necessary to check for gas leaks for the pipe fittings; do not use a
flame for this purpose but a non-corrosive substance such as soapy water or phoamy substances as contained in leak-
GB

DECLARATION OF COMPLIANCE

INSTALLATION

NOMINAL HEAT
OUTPUT
cm
TOTAL KW
40x60x90h

INSTALLING THE APPLIANCE

CHECKING FOR ADEQUATE VENTILATION

PIPE FOR GAS CONNECTION

IE
TANK CAPACITY
lt
6
12
24
GAS
CONNECTION
ISO 7-1
R 1/2"
3
/h per kW of power
m

Publicité

Table des Matières
loading

Table des Matières