Kemper variohood 232 03 02 Mode D'emploi page 20

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 8 - Placing the perforated metal rail
Now place a perforated metal rail.
Please note:
Please note:
Step 9 - Placing the perforated metal rail
Now place the next metal rail into the intermediate profile. Both rails have to be attached to each other (M5 x 20). The following rail can be
placed and attached to the others.
Step 10 - Placing the perforated metal rail
Now attach the next perforated metal rail.
Please note:
Screw connect an intermediate profile with 2 corner joints as explained in step 1.
Please note:
18
The perforation has to be positioned under the corner joint.
If the hood is set up on supports, remove the perforation of the metal rail and the intermediate profiles.
Now the provided edge protection profile can be placed onto the breaking edge.
The perforation has to be positioned under the corner joint!
If the hood is set up on supports, remove the perforation of the metal rail and the intermediate profiles.
Now the provided edge protection profile can be placed onto the breaking edge.

Publicité

Table des Matières
loading

Table des Matières