Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

Installing the cooker
The kitchen should be dry and airy and
have effective ventilation according to
the existing technical provisions.
The room should be equipped with
a ventilation system that pipes away
exhaust fumes created during combus-
tion. This system should consist of a
ventilation grid or hood. Hoods should
be installed according to the manufac-
turer's instructions. The cooker should
be placed so as to ensure free access
to all control elements.
Coating or veneer used on fitted furniture
must be applied with a heat resistant
adhesive (100°C). This prevents surface
deformation or detachment of the coat-
ing. If you are unsure of your furniture's
heat resistance, you should leave ap-
proximately 2 cm of free space around
the cooker. The wall behind the cooker
should be resistant to high temperatures.
During operation, its back side can warm
up to around 50°C above the ambient
temperature.
The cooker should stand on a hard, even
floor (do not put it on a base).
Before you start using the cooker it
should be leveled, which is particularly
important for fat distribution in a frying
pan. To this purpose, adjustable feet are
accessible after removal of the drawer.
The adjustment range is +/- 5 mm.
Install the anti-tip bracket.
To prevent the appliance tipping over, install
the anti-tip bracket provided with the applian-
ce by following the instructions below.
Drill a hole at a height of 6 cm from the floor
(A) on the wall, where the appliance will be
installed. Then drill the second hole at the
height of 10.3 cm from the floor (B). Using the
2 wall anchors and screws provided, attach
the anti-tip bracket to the wall by aligning it
with the drilled holes.
15
B
A

Publicité

Chapitres

Table des Matières
loading

Table des Matières