Eaton Metalux SSLED-LD1-12-W-UNV-L840-CD1-U Instructions D'installation page 2

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions – Steeler LED
Top Connector Box Mount
1.
Slide Top connector box onto Top cover (Figure 3).
2.
Pivot the Connector box cover to Connector box with
screw (Figure 4).
3.
Mount fixture to 3/4" NPT threaded hub and fasten
screw to lock (Figure 5).
4.
Wire according to code.
5.
Rotate the cover to insert in to Top cover slot and
fasten to Connector box (Figure 6).
Connector
box cover
Top cover
Figure 3.
Top cover
Figure 4.
3/4" NPT threaded
hub or hook
Figure 5.
2
EATON
IB507001EN
Ground wire
Quick Disconnect
Top connector
box
Connector box cover
Locking
screw
Installation instructions
Top cover
Figure 6.
Cord Installation
1.
Wire according to code (Figure 7).
2.
Thread hook or loop for mounting (Figure 8).
3.
J Box ( Supplied by others) (Figure 9).
Figure 7.
Figure 8.
Figure 9.
Connector box cover
J Box (Supplied by others)

Publicité

Table des Matières
loading

Table des Matières