Installation Instructions - Haier GE AB09SC2VHA Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions

FOR MORE HELP, VISIT HAIERAPPLIANCES.COM/DUCTLESS OR GEAPPLIANCES.COM/DUCTLESS
BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT –
instructions for local inspector's use.
IMPORTANT –
codes and ordinances.
• Note to installer – Be sure to leave these
instructions with the owner.
• Note to consumer – Keep these instructions for
future reference.
• Skill level – A licensed certified technician (to
handle refrigerant R-410A, recovery, etc) and a
qualified electrician are required for installation and
service of this split heat pump system.
• Use team lift for mounting the ducted unit.
• Proper installation is the responsibility of the
installer.
• Product failure due to improper installation is not
covered under the limited warranty.
• For personal safety, this system must be properly
grounded.
• Protective devices (fuses or circuit breakers)
acceptable for installation are specified on the
nameplate of each unit.
• Make sure to avoid wiring or plumbing inside the
wall when installing.
31-5000098 Rev. 1
Save these
Observe all governing
CAUTION
• Aluminum building wiring may present special
problems - consult a qualified electrician.
• When the unit is in the STOP position, there is still
voltage to the electrical controls.
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ge ab12sc2vhaGe ab18sc2vha

Table des Matières