Master Control Box; System Startup - Bradley Verge LVQ Serie Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

Master Control Box

Scan to watch maintenance and
troubleshooting videos for the WashBar!
12V 2A
Barrel Plug
Sensor Board 1
Connector
Sensor Board 2
Connector
LED Board
Connector

System Startup

Before providing power to WashBar, make sure the area under the WashBar is clear of any obstructions and
that sensors are clear.
The first time the WashBar is powered up, there is a sequence of LEDs that will light up.
• Within 5-10 seconds of receiving power, the WashBar will cycle it's LED lights RED, GREEN and then BLUE. Once
the LEDs turn blue, the WashBar is in Standby/Idle Mode.
If any of the WashBar LEDs flash RED, check for sensor obstruction. Once obstruction is removed or
cleaned, the WashBar LEDs will return to blue indicating that the WashBar is in Standby/Idle Mode.
• The power LED on the master control box will be GREEN indicating the unit has power.
Bradley • 215-1842 Rev. E; ECO 18-08-023
6V Power LED
Over Current LED
Proximity Cable (USB
1.1 Mini B, Female)
LCD
Status LED
USB Connector
Soap Cable
Water Valve Cable
Dryer Cable
2/4/2019
LVQD1
(Female)
19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Verge lvqd1

Table des Matières