Attach Power Line Filter; Control Box And Valve Installation - Bradley Verge LVQ Serie Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
10

Attach Power Line Filter

Secure dryer power line
A
filter to underside of bowl
using (2) #10 x 1" screws
provided.
11

Control Box and Valve Installation

Secure control box to
A
underside of bowl using
(2) #10 x 1/2" long screws
provided.
Attach 1/4" supply tube from the
WashBar to the 1/4" supply valve
outlet. Loosen the compression
B
nut on the valve body. Push the
1/4" supply tube firmly into the
tube connector until it is fully
seated. Tighten the compression
nut by hand.
For thermostatic mixing valve installation, secure 1/2" supply
hose to hot water supply valve inlet. Secure the other supply
hose from cold water supply to cold water supply valve inlet.
C
Secure valve to bowl using (2) #10 x 1/2" long screws.
For tempered line installation, secure 1/2" supply hose
to tempered water supply and TL valve inlet (not shown).
Secure valve to bowl using (2) #10 x 1/2" long screws.
Bradley • 215-1842 Rev. E; ECO 18-08-023
1/4" Water Supply
Compression Nut
Hot
Cold
Cold Supply/
Hot Supply/Stop Valve
Stop Valve
Remove 3/8" compression nut/sleeve from the
hot and cold supply stop valves. Connect 3/8"
D
end of flexible supply hose to 3/8" compression
on supply stop valve. Ensure hot and cold supply
hoses are connected to hot and cold supply stop
valve. For TL option, only connect cold supply.
2/4/2019
LVQD1
Outlet with
3/8"
Compression
Nut
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Verge lvqd1

Table des Matières