Mark TA209 Livret Technique page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.0 Transportation, handling, unpacking, storage
2.1 Delivery of the unit
When the unit is delivered, the customer MUST check the state of the goods.
Check the packaging and its contents, if damage due to transportation is found, make a reserve
for the damage on the shipping documents to be signed by the shipping agent and send a copy to
!
the supplier.
2.2 Transportation, handling and lifting
Take care when handling Evaporative Cooling units during unloading from the transportation
means, handle and position to avoid damages to the equipment.
!
Avoid contact with elements, which may damage the equipment.
The supplier declines any responsibility for damage caused during transportation, loading and
unloading of the evaporative cooling units.
2.2.1 Lifting with fork lift
Widen the forks as much as possible to balance the load. Dip the ends of the forks to avoid
damaging the bottom of the machine.
2.2.1 Lifting with cables
We suggest to attach the cables as shown, inserting spacers of an adequate length to prevent the
cables from damaging the casing when tightened.
Because of the heavy weight, TC models, when unpacked, are provided with punched brackets to
allow to lift them by using appropriate metal tubes.
EN
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Tc209

Table des Matières