Determine the location where the wiring will enter the
remote controller (back, left side, top left, top center).
3-4-1
Back outlet
Cut off resin area (notched area).
3-4-3
Top left outlet
Cut the plastic at the notched area and
remove any remaining burrs.
3-5
Install wiring.
NOTE
1. Switch box and control wiring are fi led supplied.
2.
Do not touch the remote controller printed-circuit board.
Wiring Specifi cations
Wiring Type
Wiring Size
Wiring Length Maximum 1640 feet (500m)
English
Non-shielded, 2-conductor, stranded copper wire
AWG-18
3-4-2
Left outlet
Cut the plastic at the notched area and
remove any remaining burrs.
3-4-4
Top center outlet
Cut the plastic at the notched area and
remove any remaining burrs.