30
HMF200
oil limiT
HArneSS
FIgURE A
10A
11A
THe PreSeT vAlueS on THe fAn limiT ConTrol muST noT be CHAnGed from THe fACTory
Any AdJuSTmenT To THiS ConTrol Will AffeCT THe oPerATinG effiCienCy of THe
○
once the set point limits have been confirmed, carefully manipulate the wiring inside the oil limit connec-
tion box so that installation of the connection box cover does not disturb or impede the mechanical set
point tabs and the rotary dial.
STEp #17
Sealing the oil flue and mounting lower heat shield:
○
Slide the flue fibre gasket over on the flue.
○
Slide the flue plate over the oil furnace flue pipe.
○
Secure the 5" (127 mm) flue plate to the rear panel using hex head screws (8 pcs.).
W415-1013 / A / 06.05.12
oil limiT &
mounTinG
brACkeT
bloWer module
HArneSS
LEFT HAND RA CONFIgURATION
13
14b
furnACe And Will void THe WArrAnTy CoverAGe.
oil
oil
furnACe
furnACe
flue
flue
RIgHT HAND RA CONFIgURATION
FIgURE B
CAUTION
SeTTinG.
oil limiT &
mounTinG
brACkeT
oil limiT
HArneSS
bloWer module
HArneSS
HiGH limiT
SeT PoinT
250°f (121°C)
fAn on/off
SeT PoinT 100°f (38°C)