Extended Horizontal And Corner Terminal Installation; Vertical Air Terminal Installation - Napoleon GDS26N-1 Instructions D'installation Et D'opération

Masquer les pouces Voir aussi pour GDS26N-1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.1.5 EXTENDED HORIZONTAL AND CORNER TERMINAL INSTALLATION

A 45° corner installation can have 0" (0mm) rise between the appliance
combustion air collar and the air terminal. In this case, vent lengths must be
kept to a maximum of 24" (60.9cm) . For longer vent lengths, a minimum
vertical rise of 24" (60.9cm) is required.
A. Follow the instructions for "HORIZONTAL AIR TERMINAL
INSTALLATION" section.
B. Continue adding components alternating inner and outer vent pipes. Ensure that
all inner vent pipes and elbows have sufficient vent spacers attached and each
component is securely fastened to the one prior. Attach the telescopic sleeve to the
vent run. Secure and seal. To facilitate completion, attach inner and outer couplers to
the air terminal.
C. Install the air terminal. See "HORIZONTAL AIR TERMINAL INSTALLATION" section. Extend the outer
telescopic sleeve; connect to the air terminal assembly. Fasten with screws and seal.

4.1.6 VERTICAL AIR TERMINAL INSTALLATION

MAINTAIN A MINIMUM 2" (51mm) SPACE BETWEEN THE AIR INLET BASE AND THE STORM COLLAR.
NOTE : Fastening hardware provided with appropriate roof terminal and liner kits.
A.
Fasten the roof support to the roof using 6 screws. The roof support is optional. In this case the
venting is to be adequately supported using either an alternate
method suitable to the authority having jurisdiction or the optional
roof support.
B.
Stretch the inner fl ex pipe to the required length. Slip the inner
fl ex pipe a minimum of 2" (51mm) over the inner pipe of the
air terminal connector and secure with a minimum of
3 screws. Seal using a heavy bead of Mill Pac sealant
(W573-0007) (not supplied).
C.
Repeat using the outer fl ex pipe, using a heavy bead of red
RTV silicone (W573-0002) (not supplied) and a minimum of
3 screws.
D.
Thread the air terminal connector / vent pipe assembly
down through the roof. The air terminal must be positioned vertically
and plumb. Attach the air terminal connector to the roof support,
ensuring that the top of the air terminal is 16" (40.6cm) above the
highest point that it penetrates the roof.
E.
Remove nails from the shingles, above and to the sides of the air
terminal connector. Place the fl ashing over the air terminal connector
leaving a min. 3/4" (19mm) of the air terminal connector showing
above the top of the fl ashing. Slide the fl ashing underneath the
sides and upper edge of the shingles. Ensure that the air terminal
connector is properly centered within the fl ashing, giving a 3/4"
(19mm) margin all around. Fasten to the roof. Do not nail through
the lower portion of the fl ashing. Make weather-tight by sealing with
caulking. Where possible, cover the sides and top edges of the
fl ashing with roofi ng material.
F.
Aligning the seams of the terminal and air terminal connector,
place the terminal over the air terminal connector making sure
the vent pipe goes into the hole in the terminal. Secure with 3
screws.
G.
Apply a heavy bead of weatherproof caulking 2" (51mm)
above the fl ashing. Install the storm collar around the air
terminal and slide down to the caulking. Tighten to ensure that
a weather-tight seal between the air terminal and the collar is
achieved.
H.
If more vent pipe needs to be used to reach the appliance see
"HORIZONTAL AIR TERMINAL INSTALLATION" section.
WARNING
!
2" (51mm)
AIR TERMINAL
TELESCOPIC SLEEVE
20" (508mm)
COUPLER
VENTING
48.2A
ROOF SUPPORT
INNER PIPE
AIR
TERMINAL
CONNECTOR
MILL PAC
SEALANT
(W572-0007)
INNER FLEX PIPE
OUTER FLEX PIPE
AIR INLET
BASE
CAULKING
STORM COLLAR
WEATHER
SEALANT
FLASHING
24.1D
W415-2183 / B / 02.10.17
27
EN

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Gds26p-1

Table des Matières