Complete The Installation - Kohler K-6299 Guide D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Backing
Adhesive
Locking Tape

9. Complete the Installation

Check for Leaks
Turn on the water supply.
Turn on the tank water supply.
If applicable, turn on the bidet seat water supply.
Check for leaks.
Confirm Correct Operation
Press the left side of the faceplate to confirm the full flush is
operating correctly.
Press the right side of the faceplate to confirm the eco-flush is
working correctly.
If applicable, confirm the bidet seat is functioning correctly
following the instructions provided with the seat.
Install the Side Panels
NOTE: There is a left and right side panel. They are not
interchangeable.
1145594-2-C
Adhesive
Locking Tape
12
Kohler Co.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-6300

Table des Matières