Thermal Expansion Valve - GE UUY60ZGDAA Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
Thermal Expansion Valve (TXV)
Factory Installed Expansion Valves: Sensing bulbs are
factory installed and clamped to the suction line. For
optimum performance, reattach and insulate the bulb
at a 10 or 2 o'clock position outside of the cabinet to
the main suction line no more than one foot from the
suction line connection. If necessary, the bulb can be
installed on a vertical suction line. In this instance, the
bulb must be placed before any trap, with the bulb's
capillary tube facing upward.

Thermal Expansion Valve

NOTE: Some models are equipped with thermo expansion
valve and do not require any orifice change.
NOTE: The coil comes pre-charged with refrigerant
R410A. The coil must be evacuated if the TXV valve is
changed.
31-5000486 Rev. 2
(Letter A)
15

Publicité

Table des Matières
loading

Table des Matières