Test Running; Evaluation Of The Performance - LG LAN186HV Manuel D'installation

Masquer les pouces Voir aussi pour LAN186HV:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Test Running

1. Check that all tubing and wiring are properly connected.
2. Check that the gas and liquid side service valves are fully open.
Prepare remote controller
1. Remove the battery cover by pulling it
according to the arrow direction.
2. Insert new batteries making sure that the (+)
and (–) of battery are installed correctly.
3. Reattach the cover by pushing it back into
position.
NOTICE
• Use 2 AAA(1.5volt) batteries. Do not use
rechargeable batteries.
• Remove the batteries from the remote
controller if the system is not used for a long
time.
Settlement of outdoor unit
1. Anchor the outdoor unit with a bolt and
nut[ø10mm(0.39in)] tightly and horizontally on
a concrete or rigid mount.
2. When installing on the wall, roof or rooftop,
anchor the mounting base securely with a
nail or wire assuming the influence of wind
and earthquake.
3. If the vibration of the unit is transmitted to the
hose, secure the unit with an anti-vibration
rubber.

Evaluation of the performance

Operate the unit for 15~20 minutes, then check
the system refrigerant charge:
1. Measure the pressure of the gas side service
valve.
2. Measure the temperature of the intake and
discharge of air.
3. Ensure the difference between the intake
temperature and the discharge is more than
8°C
4. For reference; the gas side pressure of
optimum condition is as below.(Cooling)
The air conditioner is now ready for use.
Bolt
Discharge air
Outside ambient
Refrigerant
TEMP.
R410A
35°C (95°F) 8.5~9.5kg/cm
Installation
Tubing connection
Intake temperature
Discharge
temperature
The pressure of the gas side
service valve.
2
G(120~135 P.S.I.G.)
Installation Manual 27

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Lan096hvLan120hsvLan120hsv2Lan180hsv2Lan180hsvLan246hv

Table des Matières