17. SAFETY

Please read the following safety regulations with care before installing and
using the charging system.

17.1 Safety instructions

Before you install the charging station, you must make sure the location is safe for all
bystanders. NEVER allow children onto this worksite. Never allow ANYONE who has nothing
to do with the work onto the worksite.
- Never be distracted while you are performing the work.
- Make sure you maintain a healthy posture at all times while doing the work.
- Do not leave any tools or charging station components unattended.
- Make sure any tools you are using are clean and dry.
- Make sure that the charging station, tools and components will stay dry
when it is raining.
When switching off the power of the system, always make sure the
measurement instrument used for testing this is checked for proper ope-
ration repeatedly.

18. MANDATORY CHECKS BEFORE COMMISSIONING

The following checks are mandatory before commissioning the Homebox.
NEVER use the Homebox if 1 or more checks indicate that the power sup-
ply or the stability of the Homebox does not meet the requirements.
Always perform the following checks before switching on the power supply
of the Homebox
√ All the following work must be carried out in full conformity with NEN 3140.
√ Check if the terminals have been properly tightened (3.5 to 5 NM).
√ Check the earth connection.
√ Check if the power cable thickness matches the fuse value.
√ Check if the Homebox has been mounted securely.
√ Check if the cable glands are watertight.
√ Keep the area around the workplace free of obstacles.