Idex Fast & Fluid Management Giotto Compact Consignes D'installation Et D'utilisation page 20

Dispenser manuel
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fast & Fluid Management Srl
A Unit of IDEX Corporation
12.- NOTES
If when starting the device through the rotation of the main switch to position "1" the green led
doesn't light, extract the electrical plug from the socket tap and control the lamp. If necessary
substitute it
If the switch returns automatically to position "O" try to operate it after few minutes : if the
problem continues , ask for the intervention of a technician.
If the pumps leak substitute the seals (every machine is supplied with a spare seal)
For this operation follow these instructions:
a)
Extract the measuring rods, screw out the ring nut body and extract the unit of
the piston.
b)
Extract the internal piston from the external piston.
c)
Remove the worn seal (all four pieces) without damaging the piston.
d)
Wash and dry very carefully of the seals
e)
Lubricate lightly the piston (the lubricant must be compatible with the paint.
f)
Remount seals (DIAGRAM 11)
During the remounting phase always procede with great attention.
g)
Completely reassemble (following the same instructions for the dismounting
and carrying them out in the opposite sequence).
In case of other problems , don't operate the machine and ask for the intervention of a tecnician.
_______________________________________________________________________________________________
DIAGRAM 11
1155007C-it,en,fr.doc – 16/10/2003
20

Publicité

Table des Matières
loading

Produits Connexes pour Idex Fast & Fluid Management Giotto Compact

Table des Matières