Idex Fast & Fluid Management Giotto Compact Consignes D'installation Et D'utilisation page 19

Dispenser manuel
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fast & Fluid Management Srl
A Unit of IDEX Corporation
11.- CONTAINER CLEANING
d)
Extract all paint from the containers
e)
Put inside about 1 liter water and let operate for about 15 minutes together with
the simultaneous action of the stirrers
f)
Empty completely the containers operating the pumps : in this way it is possible
to clean the containers, the pistons and the valve. If this operation should be
insufficient, extract completely the measuring rods, screw out the ring nut body,
extract the piston unit and remove the internal piston.
Clean all elements carefully and remount them (following the same instructions for the
dismounting and carrying them out in the opposite sequence).
g)
Dry carefully and fill again.
Start the machine following the instructions contained in " LOADING AND WORKING"
(Page 7)
_______________________________________________________________________________________________
1155007C-it,en,fr.doc – 16/10/2003
DIAGRAM 10
19

Publicité

Table des Matières
loading

Produits Connexes pour Idex Fast & Fluid Management Giotto Compact

Table des Matières