Idex Fast & Fluid Management Giotto Compact Consignes D'installation Et D'utilisation page 16

Dispenser manuel
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fast & Fluid Management Srl
A Unit of IDEX Corporation
Start up the stirring device, by switching on the main switch and setting the timer.
7.- TESTING
Set the rods (1) and (2) of the pump to the maximum level and move the corresponding pistons
(Red and Black) up and down in a normal manner but with the distribution tap closed.
Verify that with the last movements of the pump in the container no bubbling takes place,
Otherwise, continue operating the pistons untill the bubbling desappears.
This operation has to be carried out with all containers.
_______________________________________________________________________________________________
1155007C-it,en,fr.doc – 16/10/2003
DIAGRAM 6
DIAGRAM 7
16

Publicité

Table des Matières
loading

Produits Connexes pour Idex Fast & Fluid Management Giotto Compact

Table des Matières