Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

HOW TO MODIFY THE TIME SPAN BETWEEN
By low water consumption, such that the regeneration in volumetric mode is not activated for more than a week,
the softener will regenerate and rinse the resins in formed mode according to a value expressed in days of a parame-
ter that you can set. To do so, go the "advanced settings" in the menu and proceed as follows:
From the service position:
Press "menu/confirm"
Press "down" 5 times until you reach "advanced settings"
Press
Press "down" 7 times until you reach "max days between regenerations"
Press
With "up/down" set the parameter to 7 days and then press
To go back to the initial service page, press "back"
List of the most common problems. Before referring to the table, in case of malfunctioning, check if there is
salt for the regeneration and if the system is connected to power supply. If the provided solutions do not solve your
problem, please contact BALUGANI Water Treatment.
PROBLEM
The valve does not regenerate
automatically
The valve is regenerating at the
wrong time
Brine is not drawn off
Brine vat gets too full
Water is not softened after the
regeneration
The softener activates the rege-
neration too often
The valve display shows an error
notification
Brine flowing out of the softener
after regeneration
Dieses Merkblatt gehört Balugani s.r.l. - Nachdruck ohne Zustimmung des Besitzers ist verboten
TWO REGENERATIONS

PROBLEMS' SOLUTIONS

POSSIBLE CAUSE
1) Power supply is off
2) Motor disk of the phases is
damaged
Incorrect time setting
1) Incoming pressure is not
sufficient
2) Drain pipes are clogged
3) No mains water
1) Irregular filling speed
2) Air is sucked into the brine vat
1) Salt in the brine vat is missing
2) Open by-pass in the circuit
3) Hardness mixer is not closed
The softener is too small for the
household
Defective software card
1) Obstructed drain
2) No mains water
17
SOLUTION
1) Connect to power supply
2) Substitute
Set the time
1) Ensure at least 1.8 bar
2) Remove obstruction
3) Check mains water supply
1) Keep the incoming pressure
between 1,8 and 5 bar
2) Check that the connecting
parts in the pipe are intact
1) Add salt tabs in the vat
2) Close by-pass
3) Tighten the regulating screw of
water hardness
Adapt the softener of split the
household
Substitute card
1) Remove obstruction
2) Check mains water supply
EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bav8Bav10Bav12Avt5Avt9Avt12 ... Afficher tout

Table des Matières