Balance must be maintained when moving circuit locations
from main electrical distribution panel to emergency load
center. Circuit breaker positions alternate buss bars vertically.
Circuits sharing a neutral wire should either be moved together
to adjacent positions in emergency load center or not moved. If
unsure of the proper procedure or if the installation differs from
that described in this guide, consult a licensed professional at
this time.
8. Remove the main electrical distribution panel cover. Remove
appropriate size knockout from the bottom or side of the main
panel. (A two foot flexible conduit is pre-wired from the transfer
switch with built-in load center). Remove threaded lock nut from
conduit coupling. Feed all wires through knockout into main
panel. Slip lock nut over wires and tighten securely onto conduit
coupling.
Connection of Emergency Circuits
8
Circuits to be moved must be protected by same size breaker.
For example, a 15 amp 120 volt circuit in emergency load
center will replace a 15 amp 120 volt circuit in main electrical
distribution panel.
9. In the main panel, remove the black (hot) wire from the circuit
breaker that protects a circuit to be powered in the event of a
power failure. Wire nut the black wire to the matching circuit
lead wire from the emergency circuit breaker in the load center
in the transfer switch. (All circuit wires are color coded and
labeled for easy identification). UL listed wire locknuts
are included in installation kit. Trace each black (hot)
wire connected and wire nut the white (neutral) wire from the
same Romex cable (circuit) to the matching circuit number on
the white (neutral) wire from the emergency load center. Repeat
for each circuit. Repeat this process with the remaining circuits
to be powered by the generator.
NOTE:
NOTE:
Residential Transfer Switch Installation Guide
Both grounded and ungrounded conductors must be moved to
the emergency panel and connected to the new wiring from the
emergency panel using supplied wire nuts.
Models
Circuits
Connection of Emergency Circuits
9
UL approved wire nuts are included with installation kit.
10. Install the 70 amp double pole circuit breaker;13, 14, 16, and
17kW units or the 50 amp double pole breaker; 8 kW and
11 kW units (purchased or supplied separately), into main electri-
cal distribution panel. This circuit breaker must be compat-
ible with the main electrical distribution panel. It
may be necessary to reposition remaining circuit breakers or
remove circuit breakers that have been disconnected to accom-
modate the insertion of the 70 amp or 50 amp double pole circuit
breaker. Connect white wire to the main distribution panel neutral
bar. Connect solid green wire to main electrical panel ground bar.
Connect the black and red wires to the 70 amp or 50 amp double
pole circuit breaker. Reinstall the main distribution panel cover.
Install 70 Amp Circuit Breaker
10
NOTE:
10
12
Circuit
Circuit
50A, 240V
-
-
40A, 240V
-
1
30A, 240V
1
1
20A, 240V
1
-
20A, 120V
3
3
15A, 120V
3
5
14
16
Circuit
Circuit
-
1
1
1
-
-
1
1
6
5
4
5
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

12 série14 série16 sérieRtg12eza1Rtg10eza1

Table des Matières