Jaga Clima Quatro Canal H19 Instructions D'installation page 94

Masquer les pouces Voir aussi pour Clima Quatro Canal H19:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

06
Make sure that the devices are positioned correctly and that the stainless steel frames fit tightly. Use the supplied bolts and nuts to
connect the different units.
07
Min. 20cm
Position the trench in the right position.
Position the trenches at least 20cm from the window to avoid
curtains covering the grills.
09
Drill the holes into the concrete deck and use plugs to secure the
brackets.
Use a plug adapted to the floor type!
94
08
Heat-exchanger
Always position the fan to the room side and the coil to the
exterior of the building.
Mark the drill holes.
10
Use the rubber acoustic insulation on the floor brackets.

Publicité

Table des Matières
loading

Table des Matières