Installation; Positioning - Jaga Clima Quatro Canal H19 Instructions D'installation

Masquer les pouces Voir aussi pour Clima Quatro Canal H19:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

For general safety information see: warnings and safety -
ALWAYS USE THE MAIN SWITCH TO ISOLATE THE POWER SUPPLY

POSITIONING

01
Remove the cover panel before installing the appliance.
03
Position the external heigth adjustment and bolt to the trench. Do
not tighten the bolt yet.
If multiple Clima Quatro Canals, empty sections or corner 05
pieces have to be connected in a continuous installation,
continue to step 05.
Or individual installations: continue to step 07.
page 84
02
Position the acoustic insulation over each floor bracket.
04
Install the leveling screws in the trench and mount the plastic caps
to the screws.
05
For continuous installation only: Remove the stainless steel trim on
the end caps bij breaking of the pre-cut piece.
Only remove the trim pieces on the side where another
trench will be connected.
EN
93

Publicité

Table des Matières
loading

Table des Matières