Télécharger Imprimer la page

Chassis Wiring And Preparation - Friedrich Hazardgard Manuel D'installation Et D'utilisation

Climatiseur individuel pour les lieux dangereux

Publicité

Les langues disponibles

Les langues disponibles

Chassis Wiring and Preparation

STEP 3 Insert all wires into the rear of the junction box and thread the box onto the threaded bushing until tight.
Figure 29
STEP 4 Back off clockwise until the junction box is vertical with the mounting leg at the upper–right position facing the box opening.
Be sure that the shell can slide between this box and the chassis.
Figure 30
STEP 5 Insert the unit in the shell see Page 25 for help, be sure that the shell can slide between junction box and the chassis.
NOTE: Field wiring conductors to be copper and a minimum of 12 AWG. Complete junction box wiring and cover to prevent
ingress from dust and moisture. All wiring connections to the junction box are to be made with cable glands.
Figure 31
22

Publicité

loading

Ce manuel est également adapté pour:

Sh15Sh20Sh24Hazardgard sh15Hazardgard sh20Hazardgard sh24