Purging Procedures, Leak Test, And Test Run; Relocation And Maintenance - Mitsubishi Electric MSZ-SF25VE Mode D'emploi

Masquer les pouces Voir aussi pour MSZ-SF25VE:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 17

4. PURGING PROCEDURES, LEAK TEST, AND TEST RUN

4-1. PURGING PROCEDURES AND LEAK TEST
gas pipe side of the outdoor unit.
140 to
180 kgf•cm)
Open
Close
Charge hose
mmHg).

5. RELOCATION AND MAINTENANCE

5-1. REMOVING AND INSTALLING THE PANEL ASSEMBLY
Removal procedure
in
and
3
Installation procedure
the unit.
5-2. REMOVING THE INDOOR UNIT
plate.
Compound pressure gauge
0.101 MPa
Pressure gauge
Handle
Handle High
Charge hose
pump with the function to
-
core is in open position.
Unlock
Upper and
4-2. TEST RUN
, and twice for
Checking the remote (infrared) signal reception
4-3. AUTO RESTART FUNCTION
for details.)
Caution:
To the user
4-4. EXPLANATION TO THE USER
put the remote controller in the remote controller holder, how to clean, precautions for
operation, etc.).
5-3. PUMPING DOWN
side of the outdoor unit.
6) Stop the
tions for details.
When pumping down the refrigerant, stop the compressor before disconnecting
the refrigerant pipes. The compressor may burst if air etc. get into it.
opera-
operation switch
2
).
.
WARNING
-
2
).
can
-

Publicité

Table des Matières
loading

Table des Matières