Friedrich X STAR Série Manuel D'installation Et D'opération page 11

Climatiseurs de fenêtre. modèles portatifs à châssis
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 7
Cut two pieces of standard 1" lumber (supplied by installer) to the
length and width required. Place in front and back of bottom sill chan-
nel as shown in Figure G. Secure with nails (supplied by installer).
STEP 8
Seal all holes in the cabinet with caulking compound (supplied
by installer).
Figure H
SOLID MASONRY CONSTRUCTION
NOTE: ELECTRICAL RECEPTACLE LOCATION
FROM POINT "X" MUST BE WITHIN A MAXIMUM
RADIUS OF 69" FOR 115V UNITS.
CAULK ALL SIDES
CABINET
MORTAR
STEP 9
Complete the installation by following STEPS 6 through 10 of Sash
Window Instructions (Page 8). Window Seal Gasket mentioned
in STEP 8 will not be required.
IMPORTANT: Before operating your unit, read STEP 10 of Sash
Window Instructions.
POINT "X"
ELECTRICAL RECEPTACLE
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

X star xq05X star xq06X star xq08X star xq10Xstar eq08

Table des Matières