Télécharger Imprimer la page

Opex Sure Sort Traduction Des Instructions Originales page 230

Publicité

Les langues disponibles

Les langues disponibles

3. Both the host computer and scan tunnel RTM computer should start with
the UPS. Confirm that the power LEDs of both computers are on (Figure 4-
4).
Host computer power LED
RTM computer power LED
Figure 4-4: Host and RTM computer power LEDs
4. Log in to the Sure Sort Host software at the operator station (see
in to the Host software" on page
Operation
120).
Sure Sort™ Operator Manual
OPEX Corporation
"Logging
115

Publicité

loading

Produits Connexes pour Opex Sure Sort