Gree GMV-ND28TS/A-T Manuel D'utilisateur page 17

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

model
GMV-ND28TS/A-T
GMV-ND36TS/A-T
GMV-ND45TS/A-T
GMV-ND50TS/A-T
GMV-ND56TS/A-T
GMV-ND63TS/A-T
GMV-ND71TS/A-T
GMV-ND80TS/A-T
GMV-ND90TS/A-T
GMV-ND112TS/A-T
GMV-ND140TS/A-T
(12) During the installation, distance from soft drain pipe to the gasket is C mm when the bolt is
tightened. It is not allowed to apply PVC or other related glue in the joints of two ends of
drain pipe.
4.3.3 Test of Drainage System
(1) Please test drainage system after electric work is finished.
Inject approximately 1L purified water to drain pan from air vent, ensure that not to splash the
water over the electrical components (e.g. water pump. etc).
1) In case of commissioning finished, please energize the IDUs and switch to cooling or
dry mode, meanwhile, the water pump operates, you can check the draining through
the drain socket.
2) If communication wire is not connected, communication malfunction "C0" will occur
after 60s of energizing. In this case, the water pump operates automatically. Check if
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
Two-way Cassette Indoor Unit Owner's Manual
A(mm)
260
Fig 4.3.6
model
GMV-NDR28~140TS/A
14
B(mm)
740
C(mm)
10±3

Publicité

Chapitres

Table des Matières
loading

Table des Matières