Connection; Average Power And Current Integration Time; Hour-Meter Counting Start - IME Nemo D4-e Manuel D'installation

Masquer les pouces Voir aussi pour Nemo D4-e:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Nemo D4-e
1.2

Connection

select the connection
OK
to confirm
Select the type of connection required, scrupulously respecting the connected wiring
diagram.
The connections that can be selected are:
Symbol
Line
Load
1N1E
Single-phase
-
3-2E
3-phase 3 wires
Unbalanced
3-3E
3-phase 3 wires
Unbalanced
3N3E
3-phase 4 wires
Unbalanced
1.3

Average power and current integration time

Selectable integration time:
5, 8, 10, 15, 20, 30, 60minutes
The selected time is valid for both the current and the average power
select the time value
OK
to confirm
8
n°external CT Diagram
Connection
1
S 1000/452
2
S 1000/453
Aron L1 - L3
3
S 1000/454
3
S 1000/455
1.4

Hour-meter counting start

Select the magnitude which starts the hour-meter counting:
1.4a
Voltage counting start
Voltage:
counting start with > 20V phase voltage
select voltage or power
OK
to confirm
1.4b
Power counting start
select voltage or power
OK
to confirm
Power:
total active power, programmable value 0.5 ... 50%Pn
move the cursor
increase/decrease the set value
OK
to confirm
Voltage or Power
(rated power)
07/17 10783591 WEB E cod.MFD4E06

Publicité

Chapitres

Table des Matières
loading

Table des Matières