TERMOTECNICA PERICOLI PERIcooler 31 Mode D'emploi page 27

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.2.2 Installation of the pump group
If the cooler is supplied with the pump group that is not installed,
fastening to the body of the machine must be provided.
NOTE
The operations indicated below are carried out prior to the
installation and connection of the cooler.
ATTENTION
For installation, follow the pictures below, paying attention to the
reference points highlighted.
TEFLON
A
Start assembling the pump group as shown in image A, paying
attention to the points that require Teflon and those that have to
be glued.
I Image B shows the correct positioning of the clamp to lock
the float.
It is very important to observe the elevation shown as the float
protects the pump from lack of water.
PERIcooler_U171200
COLLA
Image C shows the fitting of the rubber tube to the two rub-
ber holders in accordance with the pump group (image C2) and
in accordance with the special left column (image C1) by means
of two metal clamps.
C1
C
B
ATTENTION
The water supplied must be filtered and clean, in order not to
cause disturbance or damage to the the cooler.
ATTENTION
To ensure
PERIcooler needsa hydraulic supply connections of 1".
Finish the operation by inserting the power cord of the pump in
the second cable channel as shown in Figure C.
correct operation as a humidifier and cooler the
C2
27

Publicité

Table des Matières
loading

Table des Matières