LG MULTI V ARUB Série Manuel D'utilisation page 32

Masquer les pouces Voir aussi pour MULTI V ARUB Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Refrigerant piping installation
Refrigerant piping system
Example : 3 outdoor units, 4 HR units and 11 indoor units
Outdoor unit
Y branch
HR unit
Indoor unit
H
I Case 1 ("a")
: Maximum height is 15m(236ft) if you install with Y branch.
I Case 2 ("b")
: Height is zero(0) m in HR unit serial connector.
WARNING
* : Serial connection of HR units : Capacity sum of indoor units ≤ 160kBtu/hr
• Refer to the HR unit PCB part for the valve group control setting.
• It is recommended that difference in pipe lengths between an HR unit and indoor units, for example
difference in length of a, b, c, and d, be minimized. The larger difference in pipe lengths, the more different
performance between indoor units.
• Piping length from outdoor branch to outdoor unit ≤ 10m(33ft), equivalent length : max 13m(43ft)
(For 18 HP or more)
❈ If the large capacity indoor units(5~10 HP, using over Ø15.88(5/8) / Ø9.52(3/8))are installed, it should use
Valve Group setting.
32
32
Outdoor Unit
Outdoor Unit
F2
E
E2
D1
a
D2
b
C1
c
D3
d
h
D4
Slave 1
A2
Master
A1
F1
E1
A
B1
B
C1
B2
"a"
C3
C2
g
D7
C2
f
e
D6
D5
D
C3
C4
j
k
i
"b"
D9
D10
D8
*

Publicité

Table des Matières
loading

Table des Matières