Storage Tank And Startup - GE PNRQ20RBL Manuel D'utilisation Et D'installation

Masquer les pouces Voir aussi pour PNRQ20RBL:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FILTRATION DRAIN
CONNECTION (cont.)
SECONDARY INSTALLATION:
ADAPTER INSTALLATION
CAUTION:
in clogging under adverse conditions and requires
periodic inspection/cleaning by the user.
DO NOT INSTALL THE DRAIN LINE DOWNSTREAM
OF A DISPOSER OR IN A HORIZONTAL PIPE. Install
the drain line adapter under the sink as shown (parts
included). The baffle tee shown must be installed
to prevent a clog in the Reverse Osmosis drain line.
Route the drain line from the air gap to the drain
line adapter, ensure that there are no dips, loops or
low spots in the line. The drain line adapter should
be aligned vertically so that the hose connection
points upward (the hose connection should never
be allowed to drop below 45° from this vertical
position). This installation MAY result in a slight drain
noise in the sink drain when the Reverse Osmosis
system is regenerating. If this happens, simply place
the sink drain stoppers in the strainer to suppress it.
Optional
disposer
From second
sink or
disposer
Proper drain line adapter orientation.
Installation Instructions
Using Option D may result
Maximum 45°
Baffle tee
Reverse
(mandatory)
Osmosis
drain line
Drain line
adapter
From faucet air gap
Drain line
adapter
Drain line connection should
be 180° opposite existing
horizontal pipe/baffle-tee as
shown in diagram
45°
Drain line adapter
STORAGE TANK AND
STARTUP
STORAGE TANK INSTALLATION
1. Remove the protective cap from the top of the
tank.
2. Apply 2–3 wraps
of thread tape,
in a clockwise
direction, to the
tank threads.
3. Install the push-to-connect fittings on the
threaded fitting on the tank as shown.
4. Push the 3/8" red banded tubing from the
Reverse Osmosis System into the fitting on the
storage tank.
SYSTEM STARTUP PROCEDURE
IMPORTANT
construction, ensure that house plumbing is flushed
thoroughly before opening the water supply valve.
1. Check that all tubing connections are secure.
2. Turn on the Feed Water Supply Valve.
3. Check all connection points for leaks.
4. Follow the Sanitization procedures on page 20.
5. After sanitization is complete, reinstall prefilter,
postfilter and Reverse Osmosis cartridges.
6. Membrane contains a food grade preservative.
Allow the system to fill the tank, then drain it
completely four times before using the water
from the system.
7. Recheck all water connection points a few days
later to check for small leaks.
18
Thread
tape
Storage tank
If installing the unit in new

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pnrq21rbnPnrq21rrb

Table des Matières