dirna Bergstrom bycool green line SPLIT Mode D'emploi page 20

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SPLIT
EN
PIPING AND CABLE CONNECTION
2
Connect the load unit gauges and run empty for
at least 30 minutes. Introduce the oil followed by
the R-134a refrigerant gas in accordance with
the following table.
Total pipe
length
6 m
7 m
8 m
9 m
10 m
11 m
12 m
13 m
14 m
15 m
16 m
17 m
C.C. Oil to be
introduced
20 c.c.
35 c.c.
50 c.c.
65 c.c.
80 c.c.
95 c.c.
110 c.c.
120 c.c.
135 c.c.
150 c.c.
165 c.c.
180 c.c.
20
Air conditioning for vehicles
Gas load to be
introduced
450 grs.
500 grs.
550 grs.
600 grs.
650 grs.

Publicité

Table des Matières
loading

Table des Matières