Replacing The Infrared Cover; Final Tests - GE Security SB250 Manuel D'installation

Masquer les pouces Voir aussi pour Security SB250:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Response
50 ms
time
8.

Replacing the infrared cover

• Engage the infrared cover in the grooves in the chassis, taking care not to lose the
staple. (1)
• Slide the cover upwards until it is stopped by the top plate. (2)
• Place it flat along the chassis, then slide it downwards and screw in the cover fixing
screw. (3)
9.

Final tests

After installation, make sure everything is working with an overall system test.
For SB250 and SB2100 detectors:
• Interupting the beam (intruder alarm).
Align.
Channel
B1 B2
Delay
50
600
RECEIVER
ms
S
I
G
Alarm
N
A
L
Disq.
100 ms
Potentiometer for adjusting
the intruder alarm
response time
200 ms
(Default value)
3
14
400 ms
600 ms
1
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Security sb2100Security sb450Security sb4100Security sb4200

Table des Matières