Fixing clip
SENSITIVITY
SIGNAL
POWER
2. Installing
1. Fit the fixing clip to the top plate of
the receiver module.
2. Rotate the alignment controller SB51
in the direction of the transmitting
module.
3. Connecting
Connect up the Signal and Power cables, making sure they do not pass in front of the
cells.
• Signal cable: connects to the received signal measurement terminals on the receiver
unit.
• Power cable: connects to the module's power supply or an external power supply (see
technical specifications).
Signal cable
Power cable
-
8 alignment indicator LEDs
Alignment indicator buzzer
Buzzer
activation/deactivation
Sensitivity control
Black connector to the –ve terminal on the receiver block
Red connector to the +ve terminal on the receiver block
Flasque
supérieure
Top plate
Receiver
module
Black clip to the –ve terminal of the power supply
Red clip to the +ve terminal of the power supply
12
POWER
SENSITIVITY
SIGNAL
POWER
SENSITIVITY
SIGNAL