Napoleon HD35NT-2 Instructions D'installation Et D'opération page 40

Masquer les pouces Voir aussi pour HD35NT-2:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

40
7.2
installing the blower
Open the blower kit and
A.
EN
remove the thermal disc from
the bracket. Remove the
speed control bracket from
the burner base assembly,
install the thermal disc and
speed control switch onto the
speed control bracket and
reattach to the burner base.
Reverse procedure to
B.
re-assemble.
INSTALLATION TO BE DONE BY A QUALIFIED INSTALLER and must
be electrically connected and grounded in accordance with local codes.
In the absence of local codes, use the current CSA C22.1 Canadian
electrical code in Canada or the ANSI / NFPA 70 national electrical code
in the United States.
Drywall dust will penetrate into the blower bearings, causing irreparable
damage. Care must be taken to prevent drywall dust from coming into
contact with the blower or its compartment. Any damage resulting from
this condition is not covered by the warranty policy. To safely install the fan,
turn off the electricity first.
Slide the vibration reducing pad (A) into the clip (C) and up against the
threaded stud (B) at the other end. The blower must be able
to be positioned entirely onto the pad.
Attach the connectors from the black and white wires to the
thermal disc.
Attach the connectors from the black and red wires to
the blower.
Plug the harness cord into the receptacle.
Because the blower is thermally activated, when turned on, it will automatically start approximately 10
minutes after lighting the fireplace and will run for approximately 30-45 minutes after the fireplace has been
turned off. Use of the fan increases the output of heat.
W415-2197 / A / 09.14.17
SPEED CONTROL
BRACKET
BLOWER
GASKET
THERMAL
DISC
SPEED
CONTROL
SWITCH
BLOWER
white
THERMAL
SWITCH
VARIABLE
SPEED
SWITCH
51.2
VARIABLE
SPEED
KNOB

Publicité

Chapitres

Table des Matières
loading

Table des Matières