Step 10
10.- nstall the equipments
water outlet in the auxiliary
faucet.
- Before connecting the equipment to the power network, water supply must be connected and it
must be verified that there is no water leakage.
.
- Once the accumulator deposit has been pressurized, you can start using the 5 stages Osmoser!
5. TUNE UP
Once the system has been installed and the pressurized tank has filled up, the system is ready to be used.
Connect the transformer cable to the installation power supply.
Open the entry valve and verify that the system starts producing osmotized water. To do this, verify that
there is a small water stream into the storage tank
n case of the models which incorporate pump ,it will switch on when the tank pressure is below the calibration
level. When the pump switchs on, the green LED at the front will light up.
The red LED will indicate that the equipment is properly connected.
The reverse osmosis membrane contains chemical conservation products that should be removed
before drinking trated water. lt is very important to discard the two first water productions
completely emptying the acumulator tank twice.Open the faucet until the pump stops (in each
emptying operation).
Step 11
11.-Connect the equipment cables and
connect the system to the power supply.
7