Installing And Connecting The Charging Station; Position For The Charging Station As Follows - GreenWorks Optimow 10 Manuel Opérateur

Masquer les pouces Voir aussi pour Optimow 10:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 114
Installation

INSTALLING AND CONNECTING THE CHARGING STATION

>1m
>3m
1. 1.
2.
1m
10m
>1m
35cm

Position for the charging station as follows:

In a level spot out of direct sunlight
(The front end of the charging station must not be 5 cm higher or
lower than the back end.)
Within reach of a wall socket
(The low voltage cable is 10 m long.)
With at least 3 m in front of it and 1 m to each side
(Do not position in confined spaces in the operating area.)
The majority of the charging station must be inside the operating area.
The following two options are shown in figure:
Option 1 - Charging station is completely inside the operating area.
Option 2 - Charging station partly outside the operating area.
EN
9
GREENWORKSTOOLS.EU

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Optimow 15

Table des Matières